首页|戈壁风沙流地区铁路路基风沙防护方案分析

戈壁风沙流地区铁路路基风沙防护方案分析

扫码查看
风沙是新疆戈壁风沙地区主要的不良铁路路基地质问题.为了研究戈壁风沙地区风沙对铁路路基的危害,结合格尔木至库尔勒铁路新疆段风沙防护试验段的施工,基于无人机影像、试验区段积沙特征及体系断面风沙观测数据,分析试验段防护效果,验证风沙防护形式和布置形式的有效性和安全性.结果表明,阻沙障对风速的影响主要集中在阻沙障防护高度以下,风沙在经过第一道沙障后,在 0.2m和 0.8m高度,距离沙障 2 个沙障高度处防风效应达到 90.0%~95.0%,在第Ⅳ试验区段防风效应达到 80.0%~90.0%,且随高度升高,防风效应逐渐减小.防沙效果最高的第Ⅰ防护区的积沙防护率高达 95.3%.研究结果满足该地区铁路路基风沙防护安全需求,具有较好经济效益,能为铁路路基建设成本综合评价及后期风沙防护大面积施工及项目管理提供数据支撑.
Analyses on the scheme of sand-drift protection for railway subgrade in gobi sand-drift region
Aeolian sand is the main geological problem of bad railway subgrade in Gobi Aeolian sand region of Xinjiang.In order to study the harm of sand blown by wind to railway subgrade in Gobi windy sand area,this paper investigated the construction of the test section of sand blown by wind of Xinjiang section of Golmud-Korla railway.Based on the UAV images,the comparison of sediment accumulation characteristics in test sections and the observation data of wind-blown sand in the system section,the protection effects of the test section were analyzed.The effectiveness and safety of the wind-blown sand protection form and arrangement form were verified.The results show that the effects of sand barriers on wind speed are mainly concentrated below the protective height of sand barriers.After the first sand barrier,at the height of 0.2 m and 0.8 m,the windbreak effect reaches 90.0%~95.0%at the distance of twice as the sand barrier's height,and 80.0%~90.0%at the fourth Test section.The windbreak effect decreases gradually with the height increasing.The protection rate of sediment accumulation in the first protection area is as high as 95.3%.The research results meet the safety requirements of the railway roadbed sand protection in this area,and have better economic benefits.It is provides the comprehensive evaluation of railway infrastructure construction cost and the decision-making of large-area construction and project management of wind-sand protection in the later stage.

railway subgradegobi sand flowsand protectionconstruction scheme

余沛、王玉静、高磊

展开 >

信阳学院 土木工程学院,河南 信阳,464000

中铁十五局集团有限公司,上海,200000

铁路路基 戈壁风沙流 风沙防护 施工方案

2024年度河南省科技攻关项目教育部高校学生司第二期供需对接就业育人项目

202401042960202320230112702

2024

邵阳学院学报(自然科学版)
邵阳学院

邵阳学院学报(自然科学版)

影响因子:0.286
ISSN:1672-7010
年,卷(期):2024.21(1)
  • 19