There are several boilers in the purification plant of a high-sulfur natural gas purification plant.The original design was to send the sampling water through the under-ground pipe network to the production sewage tank and discharge it as sewage to the sewage treatment plant.This article discusses the advantages and disadvantages of changing the pro-cess of boiler sampling water,not incorporating it into the sewage pipe network but recycling it,and conducting experiments to collect relevant data to verify the feasibility of recycling the sampling water.
关键词
样水回收装置/节能/经济性/锅炉排污水
Key words
sample water recovery device/energy saving/economy/boiler blow-down water