首页|高填方大直径钢波纹管涵变形机制与控制技术研究

高填方大直径钢波纹管涵变形机制与控制技术研究

扫码查看
目的 研究高填方大直径钢波纹管涵变形机制与控制技术,解决其结构变形过大的问题.方法 基于管道压缩变形公式,提出在管涵两侧一定范围内填筑水泥土材料的新技术;通过室内试验确定水泥土材料中最优水泥质量分数,再基于数值模拟和现场试验分析采用新技术施工的管涵结构的受力及变形特征及其上部竖向土压力分布规律,确定最优管侧填筑范围.结果 新填筑技术能充分利用水泥土的刚度限制管涵的变形,当管涵两侧2/3管径范围内采用水泥质量分数为8%水泥土回填时,管涵的最大竖向及水平变形分别减少了 35.1%和55.0%,结构最大应力也由管顶处转移至管涵上部45°附近,受力更为合理.结论 新填筑技术使管涵更好地与周围土体逐步变形协调,产生荷载重分布形成土拱效应,将管顶土压力由管中心向管边缘处转移,有效减小了钢波纹管涵结构变形和应力集中.
Research on Deformation Mechanism and Control Technology of Large Diameter Steel Corrugated Pipe Culvert on High Fill Subgrade
In order to solve the problem of excessive deformation of traditional high fill large diameter steel corrugated pipe culvert construction.Firstly,based on the formula of the pipe compression deformation,proposed a new technology of filling the cement soil material within a certain range on both sides of the pipe culvert.Secondly,the optimum cement mass fraction in the cement soil material was determined by laboratory tests;Finally,based on numerical simulation and field tests,analyzed the force and deformation characteristics of the pipe culvert structure constructed with the new technology and its upper vertical soil pressure distribution law,and determined the optimal pipe side filling range.The results show that the new filling technology can make full use of the stiffness of cement soil to limit the deformation of the pipe culvert.The maximum vertical and horizontal deformations of the pipe culvert are reduced by 35.1%and 55.0%,respectively,when cement soil with a mass fraction of 8% cement is used for backfilling within 2/3 of the pipe diameter on both sides of the culvert.Also,the maximum stress is transferred from the top of the pipe to the upper 45 ° of the pipe culvert,and the stress of the pipe culvert is more reasonable.The new filling technology makes the pipe culvert better coordinate with the surrounding soil,generating load redistribution to form the soil arch effect.The soil pressure on the top of the pipe is transferred from the center of the pipe to the edge,which effectively reduces the structural deformation and stress concentration of the steel corrugated pipe culvert.

high fill subgradelarge diameter steel corrugated pipe culvertfilling constructiondesign parameters optimizationdeformation control

郜新军、包建新、张浩、周同和、殷继虎

展开 >

郑州大学水利与土木工程学院,河南郑州 450001

黄淮学院土木工程学院,河南驻马店 463000

高填方路基 大直径钢波纹管涵 填筑施工 设计参数优化 变形控制

国家自然科学基金

52078469

2024

沈阳建筑大学学报(自然科学版)
沈阳建筑大学

沈阳建筑大学学报(自然科学版)

CSTPCD北大核心
影响因子:0.697
ISSN:2095-1922
年,卷(期):2024.40(1)
  • 19