石油科技论坛2024,Vol.43Issue(3) :1-9.DOI:10.3969/j.issn.1002-302X.2024.03.001

协同推进高效驱油与终极埋存加速形成CCUS新质生产力

Collaborate for High-efficiency Oil Displacement and Final Burial;Accelerate Development of CCUS New Quality Productive Forces

廖广志 王高峰 王正茂 董伟宏 雷征东 曹晨 郑达 王红庄 刘卫东 高明 黄志佳
石油科技论坛2024,Vol.43Issue(3) :1-9.DOI:10.3969/j.issn.1002-302X.2024.03.001

协同推进高效驱油与终极埋存加速形成CCUS新质生产力

Collaborate for High-efficiency Oil Displacement and Final Burial;Accelerate Development of CCUS New Quality Productive Forces

廖广志 1王高峰 2王正茂 1董伟宏 1雷征东 2曹晨 1郑达 1王红庄 2刘卫东 2高明 2黄志佳2
扫码查看

作者信息

  • 1. 中国石油油气和新能源分公司
  • 2. 中国石油勘探开发研究院
  • 折叠

摘要

超临界态CO2的驱油效果显著优于甲烷、氮气等其他常见驱油气介质.实践证明,CO2混相驱能够在水驱基础上提高采收率10~25个百分点,CO2驱能显著提高低渗透油藏可采储量,是与水驱开发同等重要的开发方式和大幅度提高采收率技术,是新时代油气开发的新质生产力.除了具有增产油气的机理,CO2驱油驱气过程还能够实现碳埋存,具备为碳中和贡献碳指标的特质.需要建立与CO2驱相适应的全新生产工程技术体系,包括建立高效开发与终极埋存油藏工程、全新注入采出与埋存井筒工程、全新地面工程密闭工艺流程、网络化CO2输送管道,确保实现CCUS井筒、地面流程、地质体和管理的完整性及油藏工程的模式化,建议建立务实的财税金融政策扶持体系,培养一批CCUS专业人才队伍,加快CCUS-EGR重大试验,实现与新能源业务融合发展.

Abstract

The displacement efficiency of supercritical state CO2 flooding are obviously better than those of other common displacement media,such as methane and nitrogen.The field CO2 flooding practice indicates that CO2 miscible displacement is able to improve the final oil recovery factor by 10 to 25 percentages compared to water flooding.CO2 flooding can remarkably increase the recoverable reserve of low-permeability reservoirs.It is the same important development method as water flooding and a technology that can dramatically enhance oil recovery.Therefore,it is the new quality productive forces for oil and gas development in the new era.In addition to the mechanism of increasing oil and gas production,CO2 flooding can also achieve carbon sequestration and contribute carbon indicators to carbon neutrality.It is necessary to establish an all-new production engineering and technological system suitable for CO2 flooding,including reservoir engineering for high-efficiency development and permanent burial,wellbore engineering for all-new injection,producing and geological storage,all-new surface engineering of closed process flow,and a network of CO2 transportation pipelines to ensure the integrity of CCUS wellbore,surface processes,geological bodies,and project management,as well as the standardization of reservoir engineering.It is proposed to establish a pragmatic workable financial and tax policy support system,cultivate a group of CCUS professional talents,and accelerate some key field pilot tests of CCUS-EGR,and realize the integration development with new energy business.

关键词

CO2驱/高效开发/终极埋存/新质生产力/工程思维

Key words

CO2 flooding/high-efficiency development/final burial/new quality productive forces/engineering mindset

引用本文复制引用

基金项目

中国石油天然气股份有限公司科技项目原油提高采收率重大开发试验科技专项(2023YQX10401)

出版年

2024
石油科技论坛
石油工业出版社有限公司 中国石油华北油田分公司勘探开发研究院 石油工业科技管理研究会

石油科技论坛

影响因子:0.834
ISSN:1002-302X
参考文献量8
段落导航相关论文