Against the carbon peak and carbon neutrality background,the power grid of Changqing Oilfield was based on its own advantages to make efforts for construction of the new-type clean and high-efficiency oilfield power system.Changqing faced a series of problems,such as inharmonious development caused by a high proportion of wind and photovoltaic electricity access to the oilfield power grid,the difficulty to operate the photovoltaic power station in the later-on period and the necessity to improve the adjustment and control ability of the power grid.Therefore,Changqing Oilfield invested more efforts for new energy power generation like wind and photovoltaic electricity,accelerated the intelligent transition of the power grid and innovate access design of the wind and photovoltaic electricity,adjustment of wind and photovoltaic power generation and operation and maintenance of the intelligent power station.Those measures optimized intelligent adjustment of the power grid and the power generation intelligent management system and based the oilfield power system mainly on new energy.The power grid of Changqing Oilfield will commit efforts to three areas at the next stage to improve its integrated adjustment ability--acceleration of source-grid-load-storage integration,development of intelligent micro grids and construction of the auxiliary platforms.Based on the measures to enhance top-level design,strengthen technological innovation and foster the high-end talents,Changqing Oilfield will continually accelerate application of new energy and intellectualization in its power grid and construct the new-type clean and high-efficiency oilfield electric power system.
关键词
新能源/智能化/油田电网/长庆油田
Key words
new energy/intellectualization/oilfield electric power grid/Changqing Oilfield