首页|Simulation study on cuttings transport of the backreaming operation for long horizontal section wells

Simulation study on cuttings transport of the backreaming operation for long horizontal section wells

扫码查看
The backreaming operation plays a significant role in safe drilling for horizontal wellbores,while it may cause severe stuck pipe accidents.To lower the risk of the stuck pipe in backreaming operations,the mechanism of cuttings transport needs to be carefully investigated.In this research,a transient cuttings transport with multiple flow patterns model is developed to predict the evolution of cuttings transported in the annulus while backreaming.The established model can provide predictions of the distribution of cuttings bed along the wellbore considering the bulldozer effect caused by large-size drilling tools(LSDTs).The sensitivity analyses of the size of LSDTs,and backreaming operating parameters are con-ducted in Section 4.And a new theory is proposed to explain the mechanism of cuttings transport in the backreaming operation,in which both the bit and LSDTs have the"cleaning effect"and"plugging effect".The results demonstrate that the cuttings bed in annuli is in a state of dynamic equilibrium,but the overall trend and the distribution pattern are obvious.First,larger diameters and longer drilling tools could lead to a higher risk of the stuck pipe.Second,we find that it is not the case that the higher flow rate is always better for hole cleaning,so three flow-rate intervals are discussed separately under the given conditions.When the"dangerous flow rate"(<33 L/s in Case 4)is employed,the cuttings bed completely blocks the borehole near the step surface and causes a stuck pipe directly.If the flow rate increases to the"low flow rate"interval(33-35 L/s in Case 4),a smaller flow rate instead facilitates borehole cleaning.If the flow rate is large enough to be in the"high flow rate"interval(>35 L/s in Case 4),the higher the flow rate,the better the cleaning effect of cuttings beds.Third,an interval of tripping velocity called"dangerous velocity"is proposed,in which the cuttings bed accumulation near the LSDTs is more serious than those of other tripping velocities.As long as the applied tripping velocity is not within the"dangerous velocity"(0.4-0.5 m/s in Case 5)interval in the backreaming operation,the risk of the stuck pipe can be controlled validly.Finally,through the factors analyses of the annular geometry,particle properties,and fluid properties in Section 5,it can be found that the"low flow rate","high flow rate"and"dangers flow rate"tend to decrease and the"dangerous velocity"tends to increase with the conditions more favorable for hole cleaning.This study has some guiding significance for risk prediction and parameter setting of the backreaming operation.

BackreamingStuck pipeHole cleaningTransient solid transportMultiple flow patterns

Yu-Fei Chen、Hui Zhang、Wen-Xin Wu、Jun Li、Yong Ouyang、Zong-Yu Lu、De-Xin Ma、Yong-Chuan Wu、Jun-Bo Liu、Ke-Rou Liu、Zhuo-Xin Dong

展开 >

China University of Petroleum(Beijing),Beijing 102249,China

Beijing Normal University at Zhuhai,Experimental and Practical Education Innovation Center,Zhuhai,519087,Guangdong,China

Oil & Gas Technology Research Institute of PetroChina Changqing Oilfield Company,Xi'an,710016,Shaanxi,China

PetroChina Xinjiang Oilfield Company,Karamay,834002,Xinjiang,China

China Oilfield Services Ltd.,Tianjin 300459,China

展开 >

国家自然科学基金国家自然科学基金Strategic Cooperation Technology Projects of CNPC and CUPB,ChinaSinopec key laboratory of drilling completion and fracturing of shale oil and gas,ChinaKey Projects of Scientific Research Plan in Colleges and Universities of Xinjiang Uygur Autonomous Region,China

5222780452174010ZLZX2020-0135800000-22-ZC0699-0004XJEDU20211028

2024

石油科学(英文版)
中国石油大学(北京)

石油科学(英文版)

EI
影响因子:0.88
ISSN:1672-5107
年,卷(期):2024.21(2)
  • 2