首页|全国首座跨海高速铁路5G网络规划建设工程

全国首座跨海高速铁路5G网络规划建设工程

扫码查看
福厦客专5G网络无线主设备项目在规划建设中面临首座高铁跨海大桥覆盖、首次大型下沉站台覆盖、高速动车通信配套可靠性等技术挑战,通过创新设备安装规范、下沉大层站台设备安装和450 km/h高速列车需求的偏置式漏缆固定方案等解决方案,成功克服了技术难题.项目的管理创新与数智化应用提升了施工效率和管理水平,确保了高质量的工程交付.福厦客专的5G网络开通显著提升了专项场景的用户网络使用感知,为未来高铁建设提供了宝贵经验.
China's First 5G Cross-ocean High Speed Railway
Fuxia Passenger Dedicated 5G wireless main equipment project in the planning and construction of the first high-speed cross-sea bridge cover,first large sinking platform,high-speed train communication reliability and other technical challenges,through innovation equipment installation specification,sinking large layer platform equipment installation and 450 km/h high-speed train demand bias leakage cable fixed solution,successfully overcome the technical problems.The management innovation and digital intelligence application of the project improve the construction efficiency and management level,and ensure the high-quality project delivery.The 5G opening of Fuzhou-Xiamen passenger Center has significantly improved the user network use perception in special scenarios and provided valuable experience for the future high-speed railway construction.

Fuzhou-Xiamen passenger railwaysea bridgehigh-speed rail technologydigital intelligence application

朱铭鸿

展开 >

中国移动通信集团福建有限公司泉州分公司,福建 泉州 362000

福厦客专 跨海大桥 高铁技术 数智化应用

2024

数字通信世界
电子工业出版社

数字通信世界

影响因子:0.162
ISSN:1672-7274
年,卷(期):2024.(9)
  • 3