大跨径斜拉桥施工阶段临时抗风措施对比分析

扫码查看
研究目的:大跨径斜拉桥在最大双悬臂施工状态下结构刚度较小,对风荷载引起的结构风致振动响应较为敏感.本文以受沿海台风影响区域的一座主跨316 m斜拉桥为研究对象,根据风洞试验确定主梁的气动三分力系数,对比分析不同风缆布置方案与不同临时墩布置方式对大桥风致响应控制效果的影响.研究结论:(1)增设临时风缆可使主梁竖弯基频提高22.0%~32.5%,对结构自身的扭转基频影响效果不显著;临时风缆对主梁竖向位移和主塔顺桥向位移控制有一定作用,固定位置在主梁最大悬臂长度的80%~90%范围内效果较好;(2)临时墩的抗风减振效果显著优于临时风缆,临时墩的设置使主梁悬臂端竖向位移响应降低了53.5%~65.5%,对主梁悬臂根部的顺桥向弯矩与横桥向弯矩的控制效果较为明显,降幅11.7%~58.8%;(3)在选择桥梁临时抗风措施时,需综合考虑抗风需求、施工条件、施工风险和经济性;(4)本研究成果可为大跨度斜拉桥临时抗风措施的选择提供参考.
Comparative Analysis of Temporary Wind-resistant Measures for Long-span Cable-stayed Bridge at Construction Stage
Research purposes:The long-span cable-stayed bridge has low structural rigidity under the maximum double-cantilever construction state and is relatively sensitive to the wind-induced vibration.To study the wind-resistant measures for long-span cable-stayed bridge,the aerodynamic tri-component force coefficients of a cable-stayed bridge with 316m length of main span,located at coastal typhoons impact area,are determined with the wind-tunnel test result,and the structural wind-induced responses are analyzed with different wind-resistant measures,including temporary wind cables and temporary piers.Research conclusions:(1)Using the temporary wind cables measurement,the vertical bending fundamental frequency of the main girder is raised with 22.0%~32.5%,and the torsional fundamental frequency has no significant change;the vertical displacement of the beam and the longitudinal displacement of the pylon are relatively reduced,the fix position of the wind cable is recommended from 80%to 90%range of the maximum cantilever length.(2)The wind vibration reduction effect of the temporary pier is significantly better than that of the temporary wind cable.Using the temporary piers measurement,the maximum reduction of the vertical displacement response of the main girder is range from 53.5%to 65.5%,and the longitudinal and transverse bending moment of the main girder at the pylon position is reduced from 11.7%to 58.8%.(3)The selection of wind resistance measures should be considered with wind-resistance requirements,construction environment,construction risks and economy costs.(4)The research results can provide reference to the wind-resistance measurement selection of long-span cable-stayed bridges.

cable-stayed bridgemaximum double-cantilever construction statetemporary piertemporary wind cableswind-induced response

刘旭政、曾健峰、王丰平

展开 >

华东交通大学轨道交通基础设施性能监测与保障国家重点实验室,南昌 330013

中国市政工程中南设计研究总院有限公司,武汉 430010

浙江数智交院科技股份有限公司,杭州 310006

斜拉桥 最大双悬臂施工状态 临时墩 临时风缆 风致响应

国家自然科学基金国家自然科学基金江西省自然科学基金江西省自然科学基金

520680265206802520232BAB20407020232BAB204071

2024

铁道工程学报
中国铁道学会 中国铁路工程总公司 中国中铁股份有限公司

铁道工程学报

CSTPCD北大核心
影响因子:0.996
ISSN:1006-2106
年,卷(期):2024.41(1)
  • 9