Scheme Research on the Introducing Heze-Lankao Railway to Lankao South Station
Research purposes:The optimal selection of variant design scheme is a multi-level system with multi-objective and multi-factor.Considering the introduction of new lines,according to the predicted traffic volume,the carrying capacity of existing lines has become saturated in the long term.Therefore,the advantages and disadvantages of each scheme were analyzed and the introduction scheme was reasonably selected.This paper studied the scheme research on the introducing Heze-Lankao railway to Lankao south station,selected the introduction scheme,and determined the most reasonable route to reduce the difficulty and investment of the project.Research conclusions:(1)This paper analyzed the advantages and disadvantages of each scheme and determined a relatively optimized recommendation scheme through the research on transportation organization,technology and economy,recent works of station throat relief,synchronous implementation of offline projects,implemented projects and many other aspects,combined with the latest intercity railway network planning in Henan Province.(2)Based on the analysis of operation conditions,line length,investment and many other aspects and the distribution of villages and towns along the line,the line scheme of introducing Lankao South Station was studied.(3)The method presents a theoretical foundation for the similar project and has certain reference value.
transportation organizationrailway line selectionimplemented projectscheme selectiontechnology and economy