高铁呼南通道邵永铁路引入邵阳地区方案研究

扫码查看
研究目的:呼南通道作为"八纵八横"国家高铁主通道之一,邵阳至永州铁路是呼南通道的重要组成部分.本文基于邵阳地区既有铁路、客流特点、城市规划等因素,研究提出邵永铁路在邵阳地区的引入方案,再根据运输能力适应、既有设备利用、工程投资节省、运营成本控制、未来持续发展等需求,进一步细化比选,形成邵永铁路引入邵阳地区的优选推荐方案.研究结论:(1)根据邵阳地区既有铁路概况,以及邵阳市城市总体规划和客运需求,研究提出邵永铁路引入邵阳站和新设邵阳南站两大系列方案;(2)通过比较分析各项具体方案的线路布局、工程投资、运输质量、未来发展等控制因素,推荐采用按线路别引入邵阳站娄邵场调整到发线分工的方案,并预留未来娄邵高铁引入邵阳站的条件;(3)本研究结果可应用于高铁呼南通道邵永段的勘察设计中,对引入工程的建设具有指导作用.
Research on the Scheme for Introducing the Shaoyang-Yongzhou Railway of the Hohhot-Nanning High-speed Rail Passage into the Shaoyang Region
Research purposes:Shaoyang-Yongzhou Railway is an important part of Hohhot-Nanning Passage,which is one of the main corridors of the"Eight Verticals and Eight horizontals"national high-speed railway.This paper presents a study of the introduction scheme for the Shaoyang-Yongzhou Railway in the Shaoyang area,considering the existing railway,passenger flow characteristics,urban planning and other factors in the area.The scheme is then refined according to the needs of transportation capacity adaptation,existing equipment utilization,project investment saving,operation cost control and future sustainable development.The optimal and recommended scheme for introducing the railway into the area is thus formed.Research conclusions:(1)Based on an overview of existing railways in the Shaoyang area,as well as an analysis of the city's overall urban planning and passenger demand,the research proposes two major series of schemes for the introduction of the Shaoyang-Yongzhou Railway into Shaoyang Station and the new Shaoyang South Station.(2)Through a comparative analysis of the line layout,engineering investment,transport quality,future development,and other controlling factors of the specific schemes,it is recommended to adopt the arrival and departure line division adjustment plan in Shaoyang Station Loudi-Shaoyang Yard of introducing the Shaoyang-Yongzhou Railway by route category,and reserve the conditions for future introduction of Loudi-Shaoyang high-speed railway to Shaoyang Station.(3)The research results can be applied in the survey and design of the Shaoyang-Yongzhou section of the high-speed railway Hohhot-Nanning Passage,which has a guiding role in the construction of the introduction project.

Hohhot-Nanning PassageShaoyang-Yongzhou RailwayShaoyang regionscheme research

谢淑润、胡明星

展开 >

武汉铁路职业技术学院,武汉 430205

中铁第四勘察设计院集团有限公司,武汉 430063

呼南通道 邵永铁路 邵阳地区 方案研究

2024

铁道工程学报
中国铁道学会 中国铁路工程总公司 中国中铁股份有限公司

铁道工程学报

CSTPCD北大核心
影响因子:0.996
ISSN:1006-2106
年,卷(期):2024.41(6)
  • 1