研究目的:高速铁路以路基形式小角度跨越既有铁路隧道浅埋段,为避免新建铁路路基荷载、施工时机械振动及后期运营等对既有铁路隧道产生不利影响,开展相关研究,评价其影响程度,优化路基结构,提出运营监测方案,对设计施工提出指导性意见,对于保障高铁和既有铁路运营安全具有重要意义.研究结论:(1)研究提出高速铁路跨越既有铁路隧道影响评价方法、控制指标、评价参数;(2)研究开展常规路基设计方案对既有铁路影响分析,结果表明既有铁路隧道结构受力接近限值水平,安全储备不足;(3)研究提出U形槽内浇筑轻质混凝土轻型结构设计方案和静力碾压措施,较常规路基设计方案,对既有铁路隧道衬砌受力影响优化幅度达30%~50%;(4)研究提出包括监测范围、内容、布设要求、频率、预警阈值等的全站仪自动化监测方案;(5)本研究成果可为其他新建铁路跨越既有铁路工程提供借鉴.
Research on the Countermeasures for High Speed Railway Subgrade Small Angle Crossing Shallow Buried Tunnel of Existing Railway
Research purposes:High speed railways cross shallow buried sections of existing railway tunnels at small angles in the form of subgrade.In order to avoid adverse effects on existing railway tunnels caused by new railway subgrade loads,mechanical vibrations during construction,and later operation,relevant research is conducted to evaluate the degree of impact,optimize the subgrade structure,propose operation monitoring plans,and provide guidance for design and construction,which is of great significance for ensuring the safety of high-speed railway and existing railway operations.Research conclusions:(1)The research proposes the impact assessment method,control indicators,and evaluation parameters for high-speed railway crossing existing railway tunnels.(2)Conducting an impact assessment of conventional subgrade design schemes,it was found that the existing railway tunnel structure is approaching the limit level of stress and has insufficient safety reserves.(3)The research proposes the design scheme and static compaction measures for pouring lightweight concrete into U-shaped grooves for lightweight structures.Compared with conventional subgrade design schemes,the optimization amplitude of the stress impact on the lining of existing railway tunnels can reach 30% to 50% .(4)A total station automation monitoring scheme is proposed,including monitoring scope,monitoring content,monitoring layout requirements,monitoring frequency,monitoring warning threshold,etc.(5)The research results can provide reference for other newly-built railway projects crossing existing railways.

high-speed railway subgradecrossing existing railways at a small angleshallow buried tunnelsengineering countermeasures

赵斗

展开 >

中国铁路设计集团有限公司,天津 300308

高速铁路路基 小角度跨越既有铁路 浅埋隧道 工程对策

2024

铁道工程学报
中国铁道学会 中国铁路工程总公司 中国中铁股份有限公司

铁道工程学报

CSTPCD北大核心
影响因子:0.996
ISSN:1006-2106
年,卷(期):2024.41(8)