首页|常导高速磁浮工程试验线初期建设长度研究

常导高速磁浮工程试验线初期建设长度研究

扫码查看
研究目的:我国常导高速磁浮已具备推进工程化试验和示范运营线建设的条件,需要建设工程试验线对高速磁浮关键技术进行验证.本文从常导高速磁浮工程试验线初期试验需求入手,工程试验线建设初期不考虑乘坐舒适性,尽量采用较大的加减速度,在满足初期达速试验需求的前提下减少初期试验线建设长度,节省试验线初期工程投资.研究结论:(1)高速磁浮工程试验线主要是确认时速600 km时的各种性能及实用化目标的有关试验;(2)工程试验线初期建设长度需满足列车加减速运行最小距离及一定匀速运行距离要求,在国产时速600 km常导高速磁浮列车参数一定的情况下,加减速度主要取决于牵引变流器的额定电压及最大电流,通过供电系统匹配性仿真计算,车辆越轻,定子分段长度越短,可提供的车辆加速度越大,工程试验线初期建设长度越短;(3)本研究结论可为常导高速磁浮工程试验线的建设提供参考.
Study on Initial Construction Length of EMS High-speed Maglev Engineering Test Line
Research purposes:China's EMS high-speed maglev has the conditions to promote engineering testing and demonstration operation line construction,and it is urgent to build an engineering test line to verify key technologies of high-speed maglev.This paper starts with the initial test requirements of EMS high-speed maglev engineering test line.The initial construction of the engineering test line does not consider ride comfort,and tries to use larger acceleration and deceleration speeds to reduce the length of the initial test line construction while meeting the requirements of initial speed testing,saving initial test line engineering investment.Research conclusions:(1)The high-speed maglev engineering test line is mainly a test to confirm various performance and practical goals at a speed of 600 kilometers per hour.(2)The initial construction length of the engineering test line must meet the requirements of the minimum distance for train acceleration and deceleration,as well as a certain uniform speed running distance.When the parameters of the domestically produced 600 km/h high-speed maglev train are fixed,the average acceleration and deceleration mainly depend on the rated voltage and maximum current of the traction converter.Through matching simulation calculation of the power supply system,the lighter the vehicle,the shorter the stator segment length,the greater the vehicle acceleration that can be provided,and the shorter the initial engineering test line construction length.(3)The research conclusion can provide reference for the construction of the engineering test line of the EMS high-speed maglev railway.

high speed maglev railwayengineering test lineinitial construction length

牟瀚林、徐绪宝、马卫华、吴杰、禹壮壮

展开 >

西南交通大学轨道交通运载系统全国重点实验室,成都 610031

中铁第四勘察设计院集团有限公司,武汉 430063

高速磁浮 工程试验线 初期建设长度

国家重点研发计划资助项目中铁第四勘察设计院集团有限公司科技研发课题

2023YFB43025002022K016

2024

铁道工程学报
中国铁道学会 中国铁路工程总公司 中国中铁股份有限公司

铁道工程学报

CSTPCD北大核心
影响因子:0.996
ISSN:1006-2106
年,卷(期):2024.41(8)