淤泥填海地层盾构近距穿越既有隧道变形控制

扫码查看
研究目的:为保障淤泥填海地层中新建盾构隧道小净距上跨既有隧道施工过程,以及运营过程中隧道变形控制需求,本文基于深圳地铁5号线上跨既有11号线隧道工程,采用数值模拟对软弱地层加固方案进行比选,提出相应的变形控制措施,并结合施工过程中的变形监测验证加固方案的可靠性.研究结论:(1)提出了基于提高隧道长期抗变形能力的地层旋喷桩加固方案,当隧道两侧加固宽度大于5m后,宽度增加对减小隧道水平收敛的影响不明显;(2)上述地层加固方案相较于未采取加固措施,可以使下卧既有隧道的上浮变形、地表沉降分别减小44%和86%,满足施工期变形控制需求;(3)施工期实测数据表明下卧既有隧道最大上浮变形为3.2 mm,沿线最大地表沉降为5 mm,均满足变形控制要求,验证了地层加固措施的可靠性;(4)本研究成果对淤泥填海地层盾构穿越节点工程的施工具有一定的借鉴意义.
Deformation Control of Shield Short-distance Crossing Existing Tunnels in Silt Reclamation Stratum
Research purposes:This study aims to ensure deformation control of a newly constructed shield tunnel crossing above an existing tunnel with short distance in silt reclamation stratum during both construction and operational phases.Based on the construction case where Line 5 of the Shenzhen Metro crossing above Line 11,a series of numerical simulations were employed to evaluate different soft stratum reinforcement schemes.Consequently,the corresponding deformation control strategies were proposed,and the effectiveness of the reinforcement scheme was verified through deformation monitoring during the construction process.Research conclusions:(1)The reinforcement scheme of the ground jet grouting pile based on improving the long-term anti-deformation ability of tunnels is proposed.It shows that the effect of the increase of the width on the horizontal convergence of the tunnel is not obvious when the reinforcement width is greater than 5 m.(2)Compared with the unreinforced case,the floating deformation of existing underlying tunnels and surface settlement are reduced by 44%and 86%after reinforcement,respectively,which can meet the deformation control requirements during the construction period.(3)The measured data of the construction period shows that the maximum floating deformation of existing tunnels is 3.2 mm,and the maximum surface settlement along the line is 5 mm,which meets the deformation control requirements,indicating that the proposed stratum reinforcement measures are effective.(4)The research results have certain reference significance for the construction of shield tunneling crossing existing projects in silt reclamation stratum.

silt reclamation stratumshield tunnelshort-distance crossingdeformation controlhigh-pressure jet grouting pile

张文龙、刘华、胡亚洲、刘人菩、谭茜元、谢楠、叶伟涛

展开 >

深圳地铁建设集团有限公司,深圳 518038

同济大学道路与交通工程教育部重点实验室,上海 201804

淤泥填海地层 盾构隧道 近距离穿越 变形控制 高压旋喷桩