首页|烟台站运输组织优化研究

烟台站运输组织优化研究

扫码查看
随着"公转铁"政策深入实施,铁路货运量持续增长,烟台站2023年日均装卸594.9车,同比增长20%,运量增长势头明显,运输需求与运输能力之间的矛盾日益突出,提升烟台站运输能力迫在眉睫.基于烟台站现状,从股道运用、运输组织、作业组织、作业联系等方面分析制约烟台站运输上量因素,并提出支撑烟台站货运增量的运输组织优化对策,优化后到发线利用率较优化前下降20.5%,有效缓解运输能力紧张的局面,提升了烟台站运输效率,为货运上量夯实基础,对于深挖烟台站运输能力具有重要的现实意义.
Research on Optimization of Transportation Organization at Yantai Station
With the deepening implementation of the madal shift from road to railway policy,the railway freight volume continues to grow.Yantai Station handled 594.9 cars per day in 2023,a year-on-year increase of 20%.The growth momentum of freight volume is obvious,and the contradiction between transportation demand and transportation capacity is becoming increasingly prominent.Therefore,it is urgent to improve the transportation capacity of Yantai Station.Based on the current situation of Yantai Station,this paper analyzed the factors restricting the transportation volume of Yantai Station from the aspects of track utilization,transportation organization,operation organization,and operation connection,and proposed optimization measures to support the increase of freight volume at Yantai Station.After optimization,the utilization rate of arrival and departure lines has decreased by 20.5%compared to before,easing the tight situation of transportation capacity and improving the transportation efficiency of Yantai Station.It lays a solid foundation for elevating freight volume,and has important practical significance for deepening the transportation capacity of Yantai Station.

Yantai StationArrival and Departure TrackTransportation OrganizationShunting OperationOperation Plan

顾伟

展开 >

中国铁路济南局集团有限公司 运输部,山东 济南 250000

烟台站 到发线 运输组织 取送作业 计划编制

2024

铁道货运
中国铁道科学研究院

铁道货运

影响因子:0.776
ISSN:1004-2024
年,卷(期):2024.42(10)
  • 12