丽江市有轨电车1号线行车方向调整研究

扫码查看
丽江有轨电车1号线设计阶段按照城市轨道交通标准采用右侧行车制,此方案一定程度上阻挡了上行列车(游客集散中心-玉龙雪山)乘客远眺雪山的视线,降低了乘客的乘坐体验与观感体验.为充分发挥旅游轨道交通观光特性,在分析行车方向调整必要性的基础上,采用仿真验证的方法,对丽江市有轨电车1号线从车型编组、运行交路、行车配线、建筑方案、设备系统等方面,进行左侧行车可行性研究,结果表明1号线采用左侧行车涉及的调整方案均具有一定的可操作性,但需对全线的配线方案及信号系统进行改造,改造费用约为1 358万元,采用平行施工工期约2个月.由于1号线存在旅游淡旺季,可在淡季停运,进行改造调整,最大程度激发丽江市有轨电车1号线对景观的带动作用.
Research on Adjusting the Driving Direction of Tram Line 1 in Lijiang City
During the design phase of Lijiang Tram Line 1,the right side running system was adopted according to the urban rail transit standards.This scheme to some extent blocked the line of sight of passengers on the up train(tourist distribution center-Yulong Snow Mountain),reducing their riding and visual experience.In order to fully leverage the sightseeing characteristics of tourism rail transit,on the basis of analyzing the necessity of adjusting the driving direction,this paper adopts a simulation verification method to conduct a feasibility study on the left side driving of the Lijiang Tram Line 1 from the aspects of vehicle composition,operating route,train wiring,building scheme,equipment system,etc.The research results show that the adjustment schemes involved in the use of left side train operation on Line 1 are operable,but the wiring scheme and signal system of the entire line need to be renovated,with a renovation cost of about 13.58 million yuan and a parallel construction period of about 2 months.Due to the peak and off-season tourism season,Line 1 can be shut down during the off-season for renovation,in order to maximize the driving effect of Lijiang Tram Line 1 on the landscape.

TramAdjustment of driving directionLeft side drivingTourism rail transitEngineering renovation

邹毓、赵阳、李卓

展开 >

高原铁路运输智慧管控铁路行业重点实验室,甘肃 兰州 730070

兰州交通大学 交通运输学院,甘肃兰州 730070

中铁第一勘察设计院集团有限公司,陕西 西安 710043

有轨电车 行车方向调整 左侧行车 旅游轨道交通 工程改造

中铁第一勘察设计院集团有限公司科研项目

2021KY55YB-09

2024

铁道技术标准(中英文)

铁道技术标准(中英文)

ISSN:
年,卷(期):2024.6(5)