In order to conduct research on the current collection and wear of collector shoe and contact rail(shee-rail)using experimental equipment,a shoe-rail relationship test rig was developed based on the current collection characteristics of shoe-rail for urban rail transit.Provide a detailed introduction to the various components,working principles of the test rig,and testing process.Simulation calculations and experimental verification show that the test rig can simulate the current collection and wear of the on-site collector shoe slide and contact rail more realistically,and the reliability of the shoe-rail relationship test rig meets the requirements.
Metro EMUCollector ShoeContact RailShoe-rail RelationshipTest Rig