Comprehensive Utilization and Benefit Analysis of Solid Waste in the Construction Period of Urban Rail Transit Engineering
Rail transit engineering has brought a large amount of solid waste problem while driving economic development and improving people's livelihood.This paper takes the solid waste during the construction period of the Nanjing-Jurong intercity rail transit project as the research object,and discusses the source,classification and pollution characteristics of solid waste during the construction period of rail transit engineering from the whole life cycle of solid waste generation,reduction,disposal and resource utilization,and analyzes the disposal and comprehensive utilization methods of solid waste in rail transit engineering represented by engineering spoil and shield muck.The results show that the use of reasonable solid waste disposal measures and comprehensive utilization methods can effectively reduce the pollution and resource waste of solid waste,and achieve economic,ecological and environmental,social benefits.