首页|铁路隧道钻爆法施工排水处置研究现状与建议

铁路隧道钻爆法施工排水处置研究现状与建议

扫码查看
钻爆法是铁路隧道岩体开挖的主要施工方式.为进一步掌握铁路隧道施工废水处理技术水平,对国内铁路建设项目钻爆法施工废水水质、水量预测模型、前端处理、末端处理等关键内容和技术进行梳理,并从水量预测模型、废水前端处理和末端处理3个方面提出进一步优化废水处理的建议.
Research Status and Suggestions on Drainage Disposal of Railway Tunnel Construction by Drilling and Blasting Method
Drilling and blasting method is the main construction method for rock excavation in railway tunnels.To further master the level of wastewater treatment technology in railway tunnel construction,key contents and technologies such as water quality and quantity prediction models,front-end treatment,and end treatment of drilling and blasting construction wastewater in domestic railway construction projects are sorted out.Suggestions for further optimizing wastewater treatment are proposed from three aspects:water quantity prediction models,front-end treatment,and end treatment of wastewater.

Railway engineeringDrilling and blasting method constructionTunnel drainageSewage disposal

樊骅、苗国林、许卫武

展开 >

中国铁道科学研究院集团有限公司 节能环保劳卫研究所,北京 100081

西藏铁路建设有限公司 质量部,西藏 拉萨 850000

西藏铁路建设有限公司 洛隆项目部,西藏 洛隆 855400

铁道工程 钻爆法施工 隧道排水 污水处理

2024

铁路节能环保与安全卫生
中国铁道科学研究院

铁路节能环保与安全卫生

影响因子:0.315
ISSN:2095-1671
年,卷(期):2024.14(6)