Research Status and Suggestions on Drainage Disposal of Railway Tunnel Construction by Drilling and Blasting Method
Drilling and blasting method is the main construction method for rock excavation in railway tunnels.To further master the level of wastewater treatment technology in railway tunnel construction,key contents and technologies such as water quality and quantity prediction models,front-end treatment,and end treatment of drilling and blasting construction wastewater in domestic railway construction projects are sorted out.Suggestions for further optimizing wastewater treatment are proposed from three aspects:water quantity prediction models,front-end treatment,and end treatment of wastewater.
Railway engineeringDrilling and blasting method constructionTunnel drainageSewage disposal