铁道运营技术2024,Vol.30Issue(2) :28-30.DOI:10.13572/j.cnki.tdyy.2024.02.008

钢筋混凝土支墩整治低矮挡墙病害

Realignment of A Low Retaining Wall Using Reinforced Concrete Piers

崔鹏
铁道运营技术2024,Vol.30Issue(2) :28-30.DOI:10.13572/j.cnki.tdyy.2024.02.008

钢筋混凝土支墩整治低矮挡墙病害

Realignment of A Low Retaining Wall Using Reinforced Concrete Piers

崔鹏1
扫码查看

作者信息

  • 1. 中国铁路南宁局集团有限公司 工电检测所,广西 南宁 530029
  • 折叠

摘要

以黎湛上行线K206+432~+700右侧浆砌片石挡墙为研究对象,分析低矮挡墙的病害特点以及周边环境变化,比选施工加固方案,提出选用改良的钢筋混凝土支墩,外加横、竖向锚杆的整治措施,经施工验证取得了较好的效果,可为整治此类低矮挡墙病害提供参考.

Abstract

This paper focuses on the mortar rubble retaining wall on the right side of K206+432~+700 Litang-Zhan-jiang upline Railway and analyzes the defects of low retaining wall and the changes of environment,com-pares reinforcement plans,and proposes the treatment measure with improved reinforced concrete pier adding horizontal and vertical anchor rods which has been achieved good results,and that can provide ref-erence for other low retaining wall defect.

关键词

挡墙病害/加固/锚杆/钢筋混凝土支墩

Key words

fender wall disease/reinforce/anchor arm/reinforced concrete support piers