The safety and reliability of the high-speed railway operation environment is the premise for the efficient operation of the train.Taking a station of the Hainan Circular High-speed Railway as the research object,which is under construction and adjacent to the operation line,through the selection and research of the automated deformation monitoring system,it is determined to use an intelligent automated monitoring system based on the hydro-static leveling system to monitor the platform and the line settlement deformation during the construction of the high-speed railway station.Co MPared with the manual monitoring,the full-time intelligent monitoring for the whole process can collect data of various monitoring items in real time,analyzing and processing them synchronously,and warn in time.The real-time high-precision measurement of the hydro-static leveling system guarantees the operation safety of the adjacent operating line.The results can provide technical reference for similar station projects.
关键词
高速铁路/限界/沉降变形/智能监测/运营线
Key words
high-speed railway/structure gauge/settlement deformation/intelligent monitoring/adjacent operation line