This article takes a large bridge project as the background and introduces the walking top push construction technology of a large span six track simply supported steel box stacked arch bridge.By comparing the hanging assembly method and the pushing method,the construction plan of"side assembly,first horizontal movement,and then vertical pushing"is determined.Analyzed the structural characteristics and technical difficulties of the six line simply supported steel box stacked arch bridge,providing a foundation for subsequent research.