首页|基于GIS+BIM的山区铁路施工进度管理系统研究

基于GIS+BIM的山区铁路施工进度管理系统研究

扫码查看
针对传统山区铁路施工进度采用电子表格管理所导致的标准化低、直观化差等问题,设计基于GIS+BIM的铁路施工进度管理系统.通过设计图形化的进度数据采集方式,为不同施工单位进度填报提供了统一的数据入口;对进度数据进行统计分析,融合工程进度计划数据,动态展示工程进展与计划情况,驱动工点BIM模型在三维场景中展示三维进度.应用表明,该系统能够提高进度数据的统一性和进度展示的直观性,为铁路施工管理数字化提供支撑.
Mountain railway construction progress management system based on GIS+BIM
In response to the problems of low standardization and poor visualization caused by the traditional use of electronic spreadsheet management for railway construction progress in mountainous areas,this paper designed a railway construction progress management system based on GIS+BIM.The paper provided a unified data entry point for different construction units to fill in their progress reports through the design of a graphical progress data collection method,conducted statistical analysis of progress data,integrated engineering progress plan data,dynamically displays engineering progress and plan status,and drove the construction site BIM model to display three-dimensional progress in a three-dimensional scene.The application shows that the system can improve the uniformity of progress data and the intuitiveness of progress display,provide support for the digitalization of railway construction management.

construction progressdata acquisitionconstruction managementWebGISBIM(Building Information Modeling)

杨震、张恒、宋永军、宁新稳

展开 >

甘肃天陇铁路有限公司,兰州 730030

中国铁路设计集团有限公司,天津 300308

城市轨道交通数字化建设与测评技术国家工程研究中心,天津 300308

西南交通大学 地球科学与环境工程学院,成都 610031

展开 >

施工进度 数据采集 建设管理 WebGIS BIM

国家自然科学基金中国国家铁路集团有限公司科技研发计划中国铁路设计集团有限公司重点课题中国铁路设计集团有限公司重点课题中国铁路设计集团有限公司重点课题

42201445L2022G0132022A025380022023A02538182022A02538013

2024

铁路计算机应用
中国铁道科学研究, 中国铁道学会计算机委员会

铁路计算机应用

影响因子:0.267
ISSN:1005-8451
年,卷(期):2024.33(3)
  • 10