首页|高速铁路长大隧道GSM-R网络冗余组网方案分析

高速铁路长大隧道GSM-R网络冗余组网方案分析

扫码查看
高速铁路长大隧道需要按照GSM-R冗余组网方案进行覆盖。目前GSM-R网络可采用数字直放站与分布式基站作为数字中继设备,两种设备均有多种组网方案。从故障应对能力、载频利用率、建设成本等多个角度开展分析,对比多种高速铁路隧道内GSM-R数字中继设备冗余组网方案,提出各种方案的适用范围和性能优劣。
Analysis of GSM-R Redundancy Networking Scheme for Long Tunnel of High Speed Railway
Long tunnels of high-speed railway need to be covered according to GSM-R redundancy networking scheme.At present,GSM-R network can use two kinds of digital relay equipment:digital repeater and distributed base station.Both of the equipment have a variety of networking solutions.This paper analyzes the fault response capability,carrier frequency utilization,construction cost and other aspects,compares various GSM-R digital relay equipment redundancy networking schemes in high-speed railway tunnels,and proposes the application scope and performance advantages and disadvantages of various schemes.

GSM-Rnetworkinghigh speed railwaytunnelwireless communication

袁廷瑞、熊洁、路晓彤、焦晓辉

展开 >

中铁二院工程集团有限责任公司,成都 610031

中国国家铁路集团有限公司工管中心,北京 100844

GSM-R 组网 高速铁路 隧道 无线通信

2024

铁路通信信号工程技术
北京全路通信信号研究设计院有限公司

铁路通信信号工程技术

影响因子:0.313
ISSN:1673-4440
年,卷(期):2024.21(1)
  • 1
  • 10