QC小组法在列控系统集成项目中的应用
Application of Quality Control Circle in Train Control System Integration Project
单鹤玲1
作者信息
- 1. 北京全路通信信号研究设计院集团有限公司,北京 100070
- 折叠
摘要
基于列控系统集成项目实施质量管理的必要性和重要性,在系统的研究项目质量管理理论知识的基础上,以质量管理(QC小组法)在沪杭列控系统集成项目实施过程中的优秀实践为支撑,对在高铁列控系统集成项目中实施质量管理模式和方法进行研究,希望提供一种适用于高铁列控系统集成项目的质量管理方法,有效控制高铁项目风险,保证项目质量,确保高铁运输安全,支持高铁事业的发展.
Abstract
Considering the necessity and importance of applying quality management in the integration project of high-speed railway train control system,this paper firstly makes systematic research on theories related to project quality management.On this basis,it makes a further analysis on the modes and methods of quality management(Quality Control Circle)by taking the successful experiences of quality management in the implementation process of Shanghai-Hangzhou high-speed railway train control system integration project as an example,hoping to provide a solution of quality management method suitable for integration project of high-speed railway train control system,so as to effectively guarantee the project quality,ensure the safety of high-speed railway transportation,and support the development of high-speed railway industry.
关键词
QC小组/高铁列控系统/系统集成项目/质量管理Key words
Quality Control Circle(QCC)/train control system for high-speed railways/system integration project/quality management引用本文复制引用
出版年
2024