According to the requirements of Serbian railway signaling system and the characteristics of the national train protection system,this paper puts forward the adaptive solution and application discussion of integration of Serbian signalling system with ETCS-2 system based on the analysis of ETCS level transition and movement authority,so as to provide technical reference for the"Go Global"of China's high-speed railway technology and equipment.
Hungary-Serbia RailwayETCS-2movement authorityoverlapdanger point