Implementation Scheme for Replacing Manual Release Panel of QJK Equipment with CTC Equipment
At present,when the QJK equipment is used on normal speed railways provide the logical check function of section occupation,the block section release after section occupation loss is achieved with the manual release panel.Meanwhile,when the TCC equipment is used on dedicated passenger lines to achieve such logical check function,such block section release is achieved with the CTC equipment.This paper presents a scheme for replacing the manual release panel of the QJK equipment with the CTC equipment on normal speed railways.Based on any analysis of different types of stations,it proposes the replacement of the manual release panel of the QJK equipment by adding interfaces with the CTC equipment.The proposed scheme can improve the function expansibility of the manual release panel,and has obvious advantages in construction as well as operation and maintenance.
manual release panelcentralized traffic control systemtrain dispatching command system