铁路通信信号工程技术2024,Vol.21Issue(7) :97-103.DOI:10.3969/j.issn.1673-4440.2024.07.015

FAO信号系统测试方案的探讨与研究

Discussion and Research on Test Scheme of Signaling System of Fully Automatic Operation System

刘斌 焦凤霞
铁路通信信号工程技术2024,Vol.21Issue(7) :97-103.DOI:10.3969/j.issn.1673-4440.2024.07.015

FAO信号系统测试方案的探讨与研究

Discussion and Research on Test Scheme of Signaling System of Fully Automatic Operation System

刘斌 1焦凤霞1
扫码查看

作者信息

  • 1. 通号城市轨道交通技术有限公司,北京 100070
  • 折叠

摘要

针对城市轨道交通FAO信号系统技术要求高、接口关系复杂等特点,结合FAO信号系统上云等最新技术发展趋势,对标欧标,采用"V"模型周期控制方法,提出FAO信号系统的测试方案,分析各阶段的测试目的、测试平台及测试内容,为FAO项目如期全功能开通提供一种测试方法的指导和借鉴.

Abstract

In response to such characteristics of FAO signaling systems for urban rail transit as high technical requirements and complex interface relationships,in view of such development trends of latest technologies as cloud-based FAO signaling systems,and in compliance with European standards,this paper proposes a test proposal for FAO signaling systems based on the"V"model cycle control method.It also analyzes the test purposes and test platforms and test items for various stages.Thus,it provides guidance and reference for the on-schedule opening of FAO projects in full functions by proposing a test method.

关键词

城市轨道交通/全自动运行系统/信号系统/测试方法

Key words

urban rail transit/Fully Automatic Operation(FAO)system/signaling system/test method

引用本文复制引用

出版年

2024
铁路通信信号工程技术
北京全路通信信号研究设计院有限公司

铁路通信信号工程技术

影响因子:0.313
ISSN:1673-4440
参考文献量15
段落导航相关论文