Discussion on Design of Train Control System in Transformation of Complex Hubs
This paper discusses some problems encountered in the design of train control system in the complex hub renovation project,including the method to choose different transition schemes in the renovation project of adding train routes for a large EMU depot,the feasibility demonstration of taking the train control system to degrade the mode for maintaining the operation of transportation,and the analysis of failures due to inadequate track circuit design and simulation content found in the dynamic verification with EMU.This paper proposes some rules followed and issues that need attention in the designing transition solutions of train control system,which have certain reference value for the implementation of similar projects.