Considering the characteristics and conditions of railway hub reconstruction,this paper introduces the optimization and improvement scheme for the selection of CTCS-3/CTCS-2 train control level transition points and the construction of vital data network when Zhangjiajie-Jishou-Huaihua Railway is connected to Huaihua South Hub.It provides a solution for the retrofitting of train control system of railway hubs from the perspectives of reducing integrated commissioning and testing workload and lowering system complexity.
关键词
铁路枢纽改造/安全数据网/列控等级转换/优化设计方案/联调联试
Key words
railway hub reconstruction/vital data network/train control level transition/optimization scheme/integrated commissioning and testing