黄草峡储气库钻井难点及对策

扫码查看
黄草峡储气库在实钻中存在浅表层震动大、三叠系须家河组机械钻速慢、嘉陵江组膏盐层定向困难、井漏复杂处理时间长、含硫目的层井漏转溢流速度快等钻井难点,制约了钻井提速.基于第 1 轮钻井资料分析了地层特征对钻井的要求,对钻具组合优化、井漏快速处理、目的层安全钻完井进行归纳总结.采用了如下对策:①表层须家河组钻进Ø660.4 mm井眼采用"牙轮钻头+钻铤"钻具组合,Ø406.4 mm井眼采用"复合钻头+螺杆"钻具组合能够实现快速安全钻进;②嘉陵江组大井眼采用"欠尺寸螺杆扶正器+Ø203.2 mm钻铤+加重"定向组合钻具,有效缓解了定向托压;③须家河组井漏采用清水强钻,嘉陵江组井漏采用"刚性粒子+桥塞"堵漏,能够快速处理井漏复杂;④含硫低压目的层在钻遇井漏失返后,采取关井反推配合压裂车连续吊灌方式,能够保障H2S不溢出至地面从而进行安全钻完井作业.应用结果证实:通过集成应用系列钻井技术,第 2 轮单井最快钻井周期缩短至 38.26d,周期同比降低 36%,故障时率同比降低 39%.
Drilling difficulties in Huangcaoxia UGS and their countermeasures
There exist drilling difficulties in Huangcaoxia underground gas storage(UGS),such as big vibration in superficial zones,low rate of penetration(ROP)in the Triassic Xujiahe Formation,inconvenient directional drilling in gypsum salt rocks of Jialingjiang Formation,much longer treatment of complex lost circulation,and quick conversion from lost circulation to overflow in sulfur reser-voirs,which may restrict ROP increase.Thus,formation characteristics to drilling requirements were analyzed in the light of the last drilling data.And some information was summarized in terms of the optimization of bottom hole assembly(BHA),rapid lost-circula-tion treatment,and safe drilling and completion.Four countermeasures were taken as follows:(i)in the superficial Xujiahe Formation,one BHA of both cone bit and drill collar was utilized to drill the Ø660.4 mm borehole,and the other of multiple drill bits and screws for the borehole of Ø406.4 mm,all achieving fast and safe drilling;(ii)in Jialingjiang Formation,an oriented BHA combined the un-der-sized screw centralizer,the drilling collar with Ø203.2 mm with the heavy wall drill pipe,was introduced to alleviate directional backing pressure;(iii)the forced drilling with fresh water was available for the lost-circulation treatment in Xujiahe Formation while both rigid particle and bridge plug for Jialingjiang Formation,which might tackle complex lost circulation immediately;and(iv)in co-ordination with continuous hanging irrigation via fracturing trucks,the shut-in reverse propulsion was employed after lost circulation came across the sulfur target with low pressure to promise H2S not spill over to the surface and thus implement the safe drilling and completion.As a result,through these drilling technologies,the fastest cycle is shortened to 38.26 days in the second drilling period,36%lower than in the last cycle,and the accident time ratio is reduced by 39%.

UGSConversion from lost circulation to overflowLost circulation in returnDirectional backing pressureFast and safe drillingHanging irrigation

黄兵、汪勇、王明华、陈涛、卓云、王成学、杜江

展开 >

中国石油川庆钻探工程有限公司川东钻探公司 重庆 401147

中国石油川庆钻探工程有限公司国际工程公司 成都 610051

储气库 漏转溢 井漏失返 定向托压 快速安全钻进 吊罐

2024

天然气勘探与开发
中油西南油气田公司勘探开发研究院

天然气勘探与开发

影响因子:0.543
ISSN:1673-3177
年,卷(期):2024.47(6)