Influence Factor of Highway Cross-section Design and the Guarantee Method of Correctness
In order to ensure the correctness of design drawing and design result and the consistency of design data,this paper adopts the method of error correction reminder messages,which can realize the connection between design result and data;and the intersection method of the consistency of primary and secondary line error,which can efficiently improve the efficiency,accuracy and quality of cross-section design.These methods have been applied to many highway projects,the effect is good,it is worth popularizing.