Study on Intelligent Upgrading of Tunneling Working Face in Dayang Mine
Taking the tunneling working face of 3307 return air tunnel of Dayang Mine as the research object,on the basis of analyzing the current situation of tunneling technology,this paper analyzes the intelligent upgrading scheme for the working face from the perspectives of automatic cut-off control,inertial navigation,work parameter monitoring and environmental monitoring,personnel safety protection,tape transport,and analyzes the optimization scheme of intelligent control system for digging working face from the aspects of construction of centralized control centre on the ground,remote control by line-of-sight,network transmission.On this basis,the expected benefits of intelligent digging working face are analyzed,which provides reference for the implementation and application of intelligent digging at a later stage.
tunneling working faceintelligentcontrol systemoptimization and upgrading