首页|基于多属性决策理论的抽蓄电站容量规划综合决策方法研究

基于多属性决策理论的抽蓄电站容量规划综合决策方法研究

扫码查看
针对风电-火电-抽蓄联合运行系统中抽蓄电站的容量规划问题,提出一种基于德尔菲法、区间直觉模糊理论、灰色关联理论和前景理论的综合决策方法.该方法考虑定性指标的不确定性、指标间的相互影响关系和决策者的风险偏好.经算例验证,所提方法能够决策出适应不同风险环境的最优容量规划方案,可为抽蓄电站容量规划问题提供参考.
RESEARCH ON COMPREHENSIVE DECISION-MAKING METHOD FOR CAPACITY PLANNING OF PUMPED STORAGE POWER STATIONS BASED ON MULTI-ATTRIBUTE DECISION-MAKING THEORY
Pumped storage technology plays an important role in maintaining the power balance of power systems and improving the operational stability of energy systems.Scientific capacity planning of pumped storage power station can help achieve economic operation of the power system,promote renewable energy development and save energy resources.In this paper,a comprehensive decision-making method based on Delphi method,interval-valued intuitionistic fuzzy theory,gray correlation theory and prospect theory is proposed for the capacity planning of pumped storage power station in hybrid wind-thermal-pumped storage power system.The proposed method considers the uncertainty of qualitative indexes,the inter-influence relationship among indexes and the risk preference of decision makers.Test results show that the proposed method can decide the optimal capacity planning scheme adapted to different risk environments,and can provide a reference for the capacity planning problem of pumped storage power stations.

wind powerpumped storage power plantshybrid systemsplanningdecision makingindicatorsrisk analysis

张成、夏沛、张晓星

展开 >

湖北工业大学新能源及电网装备安全监测湖北省工程研究中心,武汉 430068

风电 抽蓄电站 联合系统 规划 决策 指标体系 风险分析

2024

太阳能学报
中国可再生能源学会

太阳能学报

CSTPCD北大核心
影响因子:0.392
ISSN:0254-0096
年,卷(期):2024.45(9)