首页|盾构水平T接处钢管片数值分析与研究

盾构水平T接处钢管片数值分析与研究

Numerical Analysis and Research on Steel Shield of Horizontal T-shaped Docking in Shield Tunnel

扫码查看
地下管线对接是顶管盾构施工中一项重要的非开挖技术.以上海某实际工程中的顶管顶入盾构隧道为背景,展示了地下水平T形连接设计技术方案.建立了盾构水平T接处钢管片的精细有限元模型,计算分析最不利设计工况下的钢盾构管片的结构内力与变形.计算结果显示开洞对接位置处应力集中,设计时应分析应力集中原因并考虑进行加强.本文为水平T接实际应用提供了设计案例和经验.
Underground T-shaped docking is an important trenchless technology in the pipe jacking shield construction.In this paper,the actual project of pipe jacking into shield tunnel in Shanghai was giv-en as an illustration,and the technical proposal of underground T-shaped docking was presented.Compli-cated finite element model of the steel shield in the T-shaped docking was built to analyze the stress and de-formation under the worst working conditions.The numerical results indicated that the stress concentration occurred at the docking position which should be carefully analyzed,and the weak parts should be strength-ened.The results of this paper could provide an experience and practical application case for the design of the T-shaped docking.

Shield tunnelT-shaped dockingNumerical analysis

翟之阳

展开 >

上海市政工程设计研究总院(集团)有限公司 200092

盾构隧道 T形对接 数值分析

2024

特种结构
北京市市政工程设计研究总院

特种结构

影响因子:0.234
ISSN:1001-3598
年,卷(期):2024.41(6)