武钢1号高炉中修开炉操作实践

Operation practice of blow-in after intermediate overhaul of No.1 BF in WISCO

唐少波 仉翼鹏 黄珂 严琳波 TANG Shaobo ZHANG Yipeng HUANG Ke YAN Linbo
武钢技术2017,Vol.55Issue(2) :11-15.

武钢1号高炉中修开炉操作实践

Operation practice of blow-in after intermediate overhaul of No.1 BF in WISCO

唐少波 1仉翼鹏 1黄珂 1严琳波 1TANG Shaobo 2ZHANG Yipeng 2HUANG Ke 2YAN Linbo2
扫码查看

作者信息

  • 1. 武钢炼铁厂,湖北 武汉 430083
  • 2. Ironmaking Plant of WISCO,Wuhan 430083,China
  • 折叠

摘要

对武钢1号高炉2016年3月28日中修开炉过程进行了总结,介绍了开炉配料与装料、送风操作、焦炭负荷、装料制度等工艺参数的调剂过程.高炉开炉历时43 h即恢复至正常水平,整个开炉进程顺利、快速、安全,为武钢今后的开炉操作积累了实践经验.

Abstract

The process of blow-in after intermediate overhaul of No.1 blast furnace in WISCO on March 28,2016 was summarized.Adjusting processes of technical parameters such as batching and charging,air delivery operation,burden ratio,charging system of the blow-in operation were introduced.It merely took 43 h for blow-in before returning to the normal level of blast furnace.The smooth,quick and safe blow-in process has accumulated some experiences for the future blow-in operation in WISCO.

关键词

高炉/开炉/送风/装料制度

Key words

blast furnace/blow-in/air delivery/charging system