首页|"深海一号"平台聚酯缆系泊系统设计

"深海一号"平台聚酯缆系泊系统设计

扫码查看
为实现聚酯缆系泊系统在中国南海首次应用,分析"深海一号"半潜式生产储油平台特点和入级规范对聚酯缆系泊系统的要求,从总体方案、单根系泊缆构成、计算分析方法等方面进行设计,结果表明,在南海的环境条件下,该聚酯缆系泊系统满足规范和项目实际要求.
Design of Polyester Rope Mooring System for Deep Sea No.1 Semi-submersible Platform
In order to achieve the first application of polyester mooring system in the South China Sea,the characteristics of the"Deep Sea No.1"semi-submersible production and storage platform and the requirements for polyester mooring system in classification standards were analyzed.The overall plan,composition of a single mooring line,and calculation and analysis meth-ods were designed.The results indicated that under the environmental conditions of the South China Sea,the polyester mooring system meets the specifications and project requirements.

Deep Sea No.1semi-submersible production and storage platformmooring systempolyester rope

蔡元浪、张广磊、杨小龙、李俊汲

展开 >

海洋石油工程股份有限公司,天津 300461

"深海一号" 半潜式生产储油平台 系泊系统 聚酯缆

2024

船海工程
武汉造船工程学会

船海工程

CSTPCD北大核心
影响因子:0.361
ISSN:1671-7953
年,卷(期):2024.53(2)
  • 6