Analysis and Selection of the Transport Ship for a Large Pile Stabilizing Platform of Offshore Wind Power
Aiming at the selection of transport barge,location selection,lashing design and reasonable planning of cabin load transfer for large pile stabilization platform required for offshore pile foundation construction,analysis of the intact stability,total longitudinal strength and motion response of the barge were carried out against the background of a wind power project in northern sea area.It was found that the influence of the middle arch on the total longitudinal strength of the barge is greater than that of the middle sag,the reasonable loading position of the heavy load can reduce the influence of the middle arch,and the transverse wave of 3~9 s period is the most unfavorable to the sailing of the barge.The numerical results showed that the barge has a large safety margin for stability and total longitudinal strength,the movement response is safe and reasonable,and it is ca-pable of transporting the large pile stabilizing platform.