首页|某热电厂项目水土流失预测及防治措施研究

某热电厂项目水土流失预测及防治措施研究

扫码查看
工程建设带来的水土流失严重制约着中国生态环境的可持续发展.文中以江苏某拟建热电厂项目为例, 展开了对该项目的水土流失预测工作,对该项目的水土流失原因进行全方位的分析,通过对拟建项目的水土流失情况的预测给出了相对应防治方案,以减少工程建设可能带来的水土流失影响及危害.对该电厂项目的是施工建设及水土保持具有重要的指导和借鉴意义.
Study on the prediction and control measures of soil erosion in a thermal power plant
the soil erosion caused by the construction of the project seriously restricts the sustainable development of the ecological environment in China. This paper takes a power plant project in Jiangsu as an example, the prediction of soil erosion caused by the project is conducted, a comprehensive analysis of the factors of soil erosion by the project, was made. The corresponding control measures for the project through, through the prediction of soil erosion to are given in order reduce the impacts of the project construction. It has important guidance and reference significance for the power plant construction with good soil and water conservation.

thermal power plantsoil erosionprediction methodcontrol measures

闵俊杰、余寒

展开 >

国电环境保护研究院, 江苏 南京 210031

热电厂 水土流失 预测方法 防治措施

2018

污染防治技术
中国环境科学学会 江苏省环境科学学会

污染防治技术

ISSN:
年,卷(期):2018.31(2)
  • 2