首页|华东某地220kV输变电工程水土保持措施研究

华东某地220kV输变电工程水土保持措施研究

扫码查看
为有效防护 220 kV 输变电工程建设过程中产生的水土流失, 文中以华东某地 220 kV 输变电工程为例.通过分析输变电工程水土流失特征,利用类比法预测水土流失量,提出相应的水土保持措施,并分析其效益, 为今后建设输变电工程采取水土保持措施提供参考和借鉴.
Study onsoil and water conservation measures of 220 kV power transmission engineering in east China
In order to effectively protect the soil and water loss during the construction of the 220 kV power transmission engineering, the paper takes the 220 kV power transmission and transformation project in a certain place in East China as an example. By analyzing the characteristics of soil erosion in power transmission and transformation projects, using the analogy method to predict the amount of soil erosion, the corresponding soil and water conservation measures are proposed, and the benefits are analyzed, which provides reference and reference for the construction of power transmission and transformation projects in the future.

power transmission engineeringsoil and water losssoil and water conservation measures

李海涛、崔树春、胡菲

展开 >

国网淮安供电公司, 江苏 淮安 223002

江苏辐环环境科技有限公司, 江苏 南京 210038

输变电工程 水土流失 水保措施

2018

污染防治技术
中国环境科学学会 江苏省环境科学学会

污染防治技术

ISSN:
年,卷(期):2018.31(6)
  • 7
  • 4