装配式混凝土建筑施工现场群塔布置的影响因素分析
Analysis on Influence Factors of Tower Group Layout on the Construction Site of Assembled Building with Concrete Structure
方从严 1王敏2
作者信息
- 1. 芜湖职业技术学院建筑工程学院,安徽芜湖 241003;芜湖市装配式工程技术研究中心,安徽芜湖 241004
- 2. 芜湖中辰建设工程有限公司,安徽芜湖 241000
- 折叠
摘要
装配式混凝土建筑的预制构件类型繁多、数量大,现场吊装作业任务量大.装配式混凝土建筑施工现场进行群塔布置时需要考虑塔吊的选型、施工场地和道路情况、塔吊的站位和群塔作业防碰撞要求等因素.在保证群塔施工中相互运行安全的前提下,群塔的合理布置应可最大限度地提高群塔利用效率,满足施工要求.
Abstract
Prefabricated components of assembled building with concrete structure are of various types and large quantities,and the on-site hoisting volume is huge.Such factors as tower crane type selection,construction site and road conditions,tow-er crane position and anti-collision requirements for tower group operation should be taken into consideration in tower group layout.The reasonable layout of tower group can improve the utilization efficiency to the maximum extent to meet the con-struction needs on the premise of ensuring mutual operation safety of tower group construction.
关键词
装配式混凝土建筑/施工/塔吊/群塔Key words
assembled building with concrete structure/construction/tower crane/tower group引用本文复制引用