Installation Process and Application of Bedrock Deep Hole Inclinometer Pipe and Osmometer in the Same Hole
In order to solve the problem of high cost caused by laying out deep holes to monitor the internal displacement and water level in the bedrock,based on engineering examples,a method to reduce the exploration cost of internal displacement and water level in the rock body is proposed.The scheme and method of installing inclinometer and osmometer in the same hole are proposed.Combined with the engineering example,the internal displacement and water level monitoring data of the rock mass are analyzed,and the monitoring data of the rock mass are normal.The results show that the process is scientific and feasible,which can provide reference for similar projects.