The sewage biochemistry has been in formal operation since the commissioning of chemical units of coal to natural gas project,and during the operation of the sewage system,there are problems such as high temperature of raw dilute phenol water,turbidity increase and COD increase of effluent from the biochemical system.This paper analyzes the problems and develops solutions to ensure the long-period,safe and stable operation of the sewage biochemical system.