Robust scheduling of multi-mode projects based on improved genetic algorithm
For resource-constrained multi-mode project scheduling under uncertain environment,a triangular fuzzy number is introduced to represent the construction period,and the robustness of solution and quality are considered.A mathematical model with the maximum robustness as the optimization objective is established,and a genetic algorithm is designed to solve the model.Finally,through experimental analysis and comparison with other algorithms,the proposed algorithm is obviously superior to the ex-isting classical optimization algorithms.