Optimization of CE test for a control host of rail transit vehicles
A control host of a rail transit vehicle went through conduction disturbance test according to EN55011-2016,and the situation of exceeding the limit was analyzed.Targeted optimization and rectification measures were proposed to address the issue of excessive power supply,and retest was conducted.The test results indicated that the optimization and rectifica-tion measures had good effect in suppressing the excessive parts.