Study on Water Resources Demonstration and Sustainable Strategy of Mining and Mineral Processing Project in Zaozigou Gold Mine
In order to effectively avoid the excessive exploitation and waste of water resources in min-ing engineering and ensure the sustainable utilization of water resources,aiming at the water resources management problem of 2 000 t/d mining and mineral processing supporting project in Zaozigou Gold Mine Co.,Ltd.,Hezuo City,Gansu Province,the water resources and development and utilization status of the project area,the rationality of water intake and utilization,the reliability of water intake source,the poten-tial impact of water intake and utilization on water resources status and other water users,and the impact of project water withdrawal are studied in depth.The results show that the mining and mineral processing proj-ect of the gold mine conforms to the industrial policy,environmental protection policy and water resources policy.The water source is reliable,and the interference of water intake and drainage operation on the eco-logical environment is small.The water intake and drainage has good feasibility,scientificity and environ-mental protection.Based on this,targeted engineering compensation measures and water resources protec-tion suggestions are proposed to achieve a win-win situation between the sustainable development of gold mine projects and the regional ecological environment.The research results can provide reference and expe-rience for the water resources management of similar gold mining and beneficiation projects in China.
water resources demonstrationstrategygold minemining and mineral processing project