冻结法地铁联络通道施工对邻近盾构隧道管片影响的测试分析

扫码查看
为探究冻结法地铁联络通道施工对邻近盾构隧道管片的影响,依托南昌地铁1号线东延段瑶湖东站—麻丘站区间2#联络通道工程开展现场测试,对邻近管片水土压力、结构内力、竖向位移、净空收敛以及地表沉降进行长期监测.结果表明:(1)联络通道开挖前,受冻胀力影响,邻近盾构隧道管片环外水土压力有所增大,其最大值分别为170 kPa、150 kPa,相较于冻结前分别增大11.1%、15.4%;土体稳定后水土压力最大值分别为173 kPa、148 kPa,相较于冻结前分别增大12.4%、13.8%.(2)受地层冻结影响,邻近管片最大弯矩、轴力分别为-103.1 kN·m、2314 kN,相较于冻结前分别增大28.09%和 19.8%.(3)受冻胀力影响,邻近冻结侧管片安全系数降低,拱底附近安全系数降幅最大,为22.9%;土体解冻稳定后各管片安全系数增大但小于冻结前.(4)整个施工期间,地表最大隆起为2.18 mm,最大沉降为1 mm,管片最大上移量为2.3 mm,最大下沉量为0.9 mm,管片收敛变形最大值不超过3.4 mm,表明地铁联络通道冻结法施工具有较高的可靠性.
Test and Analysis of the Effect of the Freezing Construction of Subway Cross Passage on Adjacent Shield Tunnel Segment
In order to ascertain how the freezing method used for construction of subway cross passage will affect the adjacent segments,a site test has been conducted at the 2#cross passage of the Yaohu East Station—Maqiu Station section of Nanchang Metro Line 1 East Extension project,and the water&earth pressure of adjacent segments,structural internal force,vertical displacement,clearance convergence and ground settlement have been monitored in long term.As the results indicate:(1)Before excavation of the cross passage,the frost heave force will cause the water&earth pressure outside the adjacent shield tunnel segment rings to increase.The maximum values of the pressure are 170 kPa and 150 kPa,which are increased by 11.1%and 15.4%as compared with the values before freezing.After stabilization of the soil mass,the maximum values of the water&earth pressure are 173 kPa and 148 kPa,which are increased by 12.4%and 13.8%as compared with the values before freezing.(2)Under the effect of stratum freezing,the maximum bending moment and axial force of the adjacent segment are-103.1 kN·m and 2 314 kN,which are increased by 28.09%and 19.8%as compared with the values before freezing.(3)Under the effect of the frost heave force,the safety factor of the segment at the frozen side is reduced,and the safety factor near the arch bot-tom is reduced by the greatest margin,which is 22.9%.After unfreezing and stabilization of the soil mass,the safety factor of each segment is increased,but still less than the value before freezing.(4)In the construction period,the maximum heave on the surface is 2.18 mm and the maximum settlement 1 mm.The maximum upward displacement of the segment is 2.3 mm and its maximum settlement 0.9 mm.The maximum value of convergence deformation of segment is no more than 3.4 mm.These results indicate that the freezing method used for construction of subway cross passage is highly feasible.

Shield tunnelFreezing methodCross passageSurrounding rock pressureDeformation by forceSite test

石钰锋、蔡家城、张涛、张晗秋、李君贤、顾大均

展开 >

华东交通大学土木建筑学院,南昌 330013

华东交通大学江西建筑设计院有限公司,南昌 330013

中南大学土木工程学院,长沙 410075

南昌轨道交通集团有限公司,南昌 330038

中国铁路南昌局集团有限公司,南昌 330009

展开 >

盾构隧道 冻结法 联络通道 围岩压力 受力变形 现场测试

国家自然科学基金面上项目

42177162

2024

现代隧道技术
中铁西南科学研究院有限公司 中国土木工程学会隧道及地下工程分会

现代隧道技术

CSTPCD北大核心
影响因子:1.493
ISSN:1009-6582
年,卷(期):2024.61(1)
  • 18