首页|无中墙连拱隧道减振技术及安全控制标准

无中墙连拱隧道减振技术及安全控制标准

扫码查看
无中墙连拱隧道先行洞围岩及支护结构易在后行洞爆破时受到损伤与破坏.对此,依托云南勐绿高速公路隧道工程,首先结合现场振动监测和隧道支护结构爆破损伤模拟,对先行洞衬砌的振动响应及损伤分布进行分析,然后对预留隔振岩柱和铺设泡沫混凝土等措施的减振效果进行评价,确定合理的隔振柱厚度及减振层位置,并提出一种可靠的连拱隧道爆破安全控制标准方法.研究结果表明:(1)增加开挖区隔振柱厚度可以有效减小衬砌振动与损伤,考虑到后续针对预留岩柱的二次爆破施工,建议保留1m宽的岩柱;(2)减振层铺设于初期支护外侧时衬砌振动明显减小,但从减小衬砌损伤和提高隧道整体稳定性角度出发,建议将泡沫混凝土减振层铺设于先行洞二次衬砌外侧;(3)连拱隧道爆破安全控制标准为先行洞迎爆侧拱腰处质点峰值振动速度不超过25 cm/s.
Vibration Reduction Technology and Safety Control Standards for Multi-arch Tunnels without Middle Walls
The existing lining and supporting structure of the first excavated tunnel in multi-arch tunnels without middle walls are prone to damage and failure due to blasting in the subsequent excavated tunnel.To address this issue,this study,based on the Mengxing—Lvchun Expressway Tunnel Project in Yunnan,analyzes the vibration response and damage distribution of the lining in the first excavated tunnel through field vibration monitoring and blasting damage simulation of the tunnel support structure.The vibration reduction effects of measures such as reserving iso-lation rock columns and laying foam concrete layers are evaluated.Reasonable thicknesses for isolation columns and the optimal positions of vibration reduction layers are determined,and a reliable safety control standard for blasting in multi-arch tunnels is proposed.The results show that:(1)Increasing the thickness of the isolation rock column in the excavation area can effectively reduce the lining vibration and damage.Considering subsequent secondary blasting for the reserved rock column,it is recommended to retain a 1 m wide rock column.(2)Placing the vibration reduction layer outside the initial support can significantly reduce the lining vibration.However,to mini-mize lining damage and enhance the overall tunnel stability,it is recommended to place the foam concrete vibration reduction layer outside the secondary lining of the first excavated tunnel.(3)The safety control standard for blasting in multi-arch tunnels is that the peak particle velocity(PPV)at the arch waist on the blasting side of the first excavated tunnel should not exceed 25 cm/s.

Multi-arch tunnelBlasting vibration reductionIsolation columnVibration reduction layerConcrete plastic damageSafety control

孟德生、彭小东、杨光华

展开 >

中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉 430071

中国科学院大学,北京 100049

攀枝花青杠坪矿业有限公司,攀枝花 617200

连拱隧道 爆破减振 隔振柱 减振层 混凝土塑性损伤 安全控制

2024

现代隧道技术
中铁西南科学研究院有限公司 中国土木工程学会隧道及地下工程分会

现代隧道技术

CSTPCD北大核心
影响因子:1.493
ISSN:1009-6582
年,卷(期):2024.61(6)