钢结构涂装完工后追加焊接连接零件的涂装
The Coating of Additional Welding Connection Parts of Coated Steel Structure
杨锋 1苗硕 1王凤琴 1陈洁 1陈玲1
作者信息
摘要
对钢结构涂装完工后追加焊接连接零件的原因进行说明,对追加零件时涂装的难点和方法以及如何对原有涂层的保护进行阐述,并进行了相关的试验.
Abstract
In the paper,the reasons for adding welded link parts after the completion of steel structure painting are explained,the difficulties and methods of painting additional parts and how to protect the original coating are described,and the related tests are carried out.
关键词
钢结构/焊接/零件/涂装Key words
steel structure/welding/part/coating引用本文复制引用
基金项目
南通市社会民生科技计划项目(MSZ2023124)
出版年
2024