现代制造技术与装备2024,Vol.60Issue(5) :176-179.

混凝土-钢结构混合式风电塔架转接段制作工艺探索与实践

Exploration and Practice of Production Technology of Concrete-Steel Hybrid Wind Power Tower Transfer Section

张晶 陈琨 高金芳 吴双
现代制造技术与装备2024,Vol.60Issue(5) :176-179.

混凝土-钢结构混合式风电塔架转接段制作工艺探索与实践

Exploration and Practice of Production Technology of Concrete-Steel Hybrid Wind Power Tower Transfer Section

张晶 1陈琨 1高金芳 1吴双1
扫码查看

作者信息

  • 1. 中国水电四局(酒泉)新能源装备有限公司,酒泉 735000
  • 折叠

摘要

主要探讨混凝土-钢结构混合式风电塔架转接段制作过程中的关键环节,采用精确切割技术、焊缝温度控制以及精细化法兰组合操作等手段,对塔架整体制造工艺的科学性和可行性进行全面考究,并提出一套具有显著成效的制作方法.

Abstract

This paper mainly discusses the key links in the production process of concrete-steel hybrid wind power tower transfer section,adopts precise cutting technology,weld temperature control and fine flange combination operation,and comprehensively studies the science and feasibility of the overall manufacturing process of the tower,and puts forward a set of production methods with remarkable results.

关键词

混凝土-钢结构/混合式/风电塔架/转接段/制作工艺

Key words

concrete-steel structure/hybrid type/wind power tower/switching section/production technology

引用本文复制引用

基金项目

预应力混凝土与钢结构混合型风电塔架制作工艺研究与应用项目(22ZY1QF001)

出版年

2024
现代制造技术与装备
山东省机械设计研究院 山东机械工程学会

现代制造技术与装备

影响因子:0.197
ISSN:1673-5587
参考文献量5
段落导航相关论文