Analysis of Treatment and Prevention of Blast Furnace Cooling Technology for Baosteel 2500 m3 Blast Furnace
The article analyzes the reasons why the 2500 m3 blast furnace at Baosteel Iron and Steel Plant cannot be produced normally due to the large opening of the furnace after long-term shutdown.It is believed that the main reasons for the cooling of the furnace are the untimely adjustment of Ti load,improper operation and treatment of the blast furnace,and leakage of cool-ing equipment after using vanadium titanium ore for smelting shutdown.A summary of the experience in handling the furnace cooling accident was made,and methods and preventive measures were proposed.